The wastewater disposal concept for the former independent municipality of Kitzen with the district Kleinschkorlopp from 2011 provides for drainage in the separation system for this district. In 2012, the community of Kitzen...
Place of execution: Kitzener Street, Pegau, Saxony
Time period: Apr 2015 - Dez 2017
The State Building Authority Nuremberg commissioned R & H Umwelt GmbH with comprehensive services for the Armed Forces property MDT81 in Greding. The scope of services included orienting building substance investigations on several buildings. The main focus was ...
Place of execution: Greding, Bavaria
Time period: 2016 - 2017
Since the 1990s, the residential area "Am Wasserturm" in the south of the city of Pegau on the border with the municipality of Elstertrebnitz has been developed. Parallel to the basic road construction, a new sewerage system with connection to the continuing sewerage system of the city of Pegau and new drinking water pipes were laid on behalf of the Zweckverbandes Wasser/Abwasser Bornaer Land. Furthermore ...
Place of execution: Am Wasserturm, Pegau, Saxony
Time period: Jan 2010 - May 2017
An innovative energy concept was developed for the heating and cooling of the new headquarter. The basis of this energy concept is a probe field with 4,500 drill metres, which provides a large part of the required heating and cooling energy. The geological conditions ...
Place of execution: Silberstraße 1, Lauf an der Pegnitz, Bavaria
Time period: 2013 - 2018