Show projects:
Infrastructure & Foundation Soil

Canal and road construction in Kitzener Street in Kleinschkorlopp district of Pegau

The wastewater disposal concept for the former independent municipality of Kitzen with the district Kleinschkorlopp from 2011 provides for drainage in the separation system for this district. In 2012, the community of Kitzen...

Place of execution: Kitzener Street, Pegau, Saxony

Time period: Apr 2015 - Dez 2017

Environment

Armed forces properties Greding

The State Building Authority Nuremberg commissioned R & H Umwelt GmbH with comprehensive services for the Armed Forces property MDT81 in Greding. The scope of services included orienting building substance investigations on several buildings. The main focus was ...

Place of execution: Greding, Bavaria

Time period: 2016 - 2017

Infrastructure & Foundation Soil

Development of the residential area “Am Wasserturm” in Pegau / Elstertrebnitz

Since the 1990s, the residential area "Am Wasserturm" in the south of the city of Pegau on the border with the municipality of Elstertrebnitz has been developed. Parallel to the basic road construction, a new sewerage system with connection to the continuing sewerage system of the city of Pegau and new drinking water pipes were laid on behalf of the Zweckverbandes Wasser/Abwasser Bornaer Land. Furthermore ...

Place of execution: Am Wasserturm, Pegau, Saxony

Time period: Jan 2010 - May 2017

Energy

Geothermal heat & cold supply of the Thomas Sabo headquarter

An innovative energy concept was developed for the heating and cooling of the new headquarter. The basis of this energy concept is a probe field with 4,500 drill metres, which provides a large part of the required heating and cooling energy. The geological conditions ...

Place of execution: Silberstraße 1, Lauf an der Pegnitz, Bavaria

Time period: 2013 - 2018

Environment

Orienting investigation regarding contaminated sites of a former petrol station area near Munich

As part of the establishment of a market value assessment, the implementation of an orienting investigation regarding contaminated sites with regard to the pathway soil-water is planned on the ground of a former petrol station area. Scope of the investigation measures ... Place of execution: Dachauer Str. 487A, Munich, Bavaria Time period: Jul - Nov 2015
Environment

Demolition of 3 bridge constructions near Zwenkau

In the course of the operational management of the Zwenkau opencast mine, the highway (F186) from Knautnaundorf via Eythra to Zwenkau, which was in the area of ​​influence of the opencast mine, was strained due to mining and partly excavated. According to the final operating plan, the demolition of the three bridge constructions is planned in order to prevent danger. A repair or new construction of the bridges is economically not justifiable and not required. The town of Zwenkau demanded the restoration of the route connection including ... Place of execution: Alte Eythraer Straße, Zwenkau, Saxony Zeitraum: Aug 2014 - Nov 2016
Infrastructure & Foundation Soil

Reorganization of the wastewater disposal in Rückmarsdorf near Leipzip

The incurring wastewater of the daycare center "Spatzennest" in Rückmarsdorf, which was built in 1994, was originally supposed to be pumped into a planned public sewer. Two pits were planned in front of the daycare center building, with the first pit planned as a faecal accumulative chute and the second pit as a sewage pumping station. In the meantime, the wastewater was collected in these pits, which were cleared regularly. Since the aforementioned public sewer was not built ... Place of execution: Rückmarsdorf, Leipzig, Saxony Time period: Sep 2015 - Jan 2017
Environment

Sewer-/ road construction project Frankeplatz in Pegau

As part of a complex renovation of the town centre, the town of Pegau commissioned - due to the poor building condition (different materials, bumps, insufficient road drainage) - the road development of the Frankeplatz and the side streets (Salzgasse, Mariengasse, Topfmarkt) including the existing walkways and parking areas. In addition to the structural upgrading of the townscape and the optical adaptation to the neighbouring streets, another contribution was ... Place of execution: Frankeplatz, Pegau, Saxony Time period: Jun 2004 - Jan 2013
Energy

Infrastructural development of the community Elstertrebnitz

Starting at the town exit of Pegau, the basic road development of the main road including the related side streets as well as the installation of a new sewer and drinking water pipelines took place in Elstertrebnitz since 1997 in the districts Eulau, Elstertrebnitz, Tannewitz, Trautzschen, Greitschütz and Costewitz. In 2013, the preparatory plannings (preliminary and design planning) for the remaining construction phases took place. In addition to the structural upgrading of the townscape and the optical adaptation to ... Place of execution: Elstertrebnitz, Saxony Time period: 1997 - 2016
Infrastructure & Foundation Soil

General drainage plan for the town of Groitzsch

The municipality of Groitzsch intended to update the general drainage plan of the town of Groitzsch from the years 1997 and 1998, prepared by the engineering office Robert Hossfeld GmbH (now R & H Umwelt GmbH), and commissioned the engineering office with the updating of the inventory and the hydraulic calculation of the actual state. In a further processing step, the prognosis and remediation condition of the sewer system of the town of Groitzsch should be ... Place of execution: Groitzsch, Saxony Time period: Jul 2009 - May 2010
Infrastructure & Foundation Soil

General drainage plan for the community of Oberammergau

The general drainage plan of the community of Oberammergau covers the entire mixed and wastewater sewer system as well as the drainage-relevant rainwater pipes. In addition, the general drainage plan comprises the hydraulic calculation of all special sewer buildings up to the discharge into the sewage treatment plant. By taking into account the inventory plans of the canal construction measures carried out since the continuation in the year 2000 and by surveying location inspections ... Place of execution: Oberammergau, Bavaria Time period: May 2013 - Sep 2014
Infrastructure & Foundation Soil

Ground remediation of the Abt-Windolf-Straße in Pegau

Due to the age-related poor building condition of the road and the sidewalk, the town of Pegau planned the remediation of the Abt-Windolf-Straße in Pegau. The construction measure included the bituminous remediation of the road in overlay. Furthermore, the walkway and the gutter had to be completely renewed. The overall length of the measure was 162 m (main road) and 43 m (side street) ... Place of execution: Pegau, Saxony Time period: May 2016 - Feb 2017
Water

Prior site of the former chromatic colors factory Gademann

Soil contamination (about 450,000 t) with PAH and heavy metals (especially Cd, Zn, Ba, Ni, Cu, Pb) as well as arsenic, groundwater monitoring and remediation planning for the construction of a seal wall to secure the adjacent drinking water production, expert contribution regarding the nature conservation law to the treatment of the protected area difficulty (FFH- and SPA area, NSG, LSG and biotope areas including bat deposits) ... Place of execution: Schweinfurt, Bavaria Time period: 1994 - 2010
Environment

Investigation of contaminated sites in Erding

The former military property "Fliegerhorst Erding" is subdivided into the two sections "Nordkopfgelände" and "Freifläche" with a common area of ​​approx. 9.5 ha. Here, preliminary investigations were carried out to clarify the suspicion of contaminated sites. For the assessment of the impact path soil-water - after a previous investigation of explosive ordnance by magnetometer - a total of 97 exploratory drillings with accompanying soil air sampling and ... Place of execution: Erding, Bavaria Time period: Jan - Apr 2013
Environment

Abandoned landfill, domestic waste dump in Dietmering

As part of the orienting investigation regarding contaminated sites of the surface, the current state of the deposit as well as the possible endangerment of the individual impact paths soil-water, soil-human and if necessary soil-agricultural plant, should be evaluated by soil, soil air and groundwater investigations ... Place of execution: Dietmering, Steinhöring, Bavaria Time period: Sep 2012 - Jan 2013
Infrastructure & Foundation Soil

Wastewater disposal / restructuration of a road in Osterbichl

The König-Ludwig-Straße is located on the west bank of the Ammer, southwest of the town centre of Oberammergau. The road serves as an access road for a grown residential area. The existing mixed water sewer system in this area was in need of replacement and rehabilitation for hydraulic and structural reasons. In the course of the canal construction measure ... Place of execution: König-Ludwig-Straße, Oberammergau, Bavaria Time period: Jan 2012 - Dec 2013
Infrastructure & Foundation Soil

Wastewater disposal Attel

The city of Wasserburg decided to connect the wastewater of the catchment area of ​​the treatment plant Attel to the sewer system of the city. In contrast to the district of Attel, the districts of Limburg, Kornberg, Au and Reisach still had no connected sewer system. The domestic wastewater was mainly disposed into its own three-chamber pits. To overcome existing height differences, 5 pumping stations were built and ... Place of execution: Attel, Wasserburg, Bavaria Time period: Jul 2009 - Dec 2012
Water

Examination of the drinking water protection area of the community of Neubeuern

The implementation of a hydrogeological baseline report as well as the water rights application … Place of execution: Neubeuern, Bavaria Zeitraum: Dec 2005 - Dec 2013
Environment

Exploration of pollutants and preliminary planning for the demolition of an old children’s hospital

On the grounds of the old children's hospital Fürth, the district hospitals of Middle Franconia are planning the establishment of a psychiatric clinic. As a preparatory measure, the children's hospital, which has not been used for years, should be demolished. The building is 7 storeys high and has a gross capacity of over 40,000 m3 ... Place of execution: Jakob-Henle-Straße 1, Fürth, Bavaria Time period: May - Jul 2014
Environment

Declaration hall, landfill Rothmühle

The declaration hall has a direct connection to the premises of the waste management centre Rothmühle in Bergrheinfeld, the disposal centre of the county of Schweinfurt. The plant is primarily used for the temporary storage of pre-declared excavated earth and construction waste, initially coming from the remediation measure of Sattler'sche contaminated sites in Schonungen near Schweinfurt. The material is kept in a mainly closed hall until the final ... Place of execution: Schweinfurt, Bavaria Time period: Jan 2011 - Jan 2012
Infrastructure & Foundation Soil

Bypass road for a bridge in need of rehabilitation near Pegau

The 2nd flood bridge in the area of ​​the local connecting road between Pegau and Groitzsch was temporarily closed to motorised traffic due to massive bridge damage. The landmarked arch bridge made of clinker brickwork should in future only be free for pedestrians and bicycle traffic. The bypass road would in future only be allowed for car traffic up to 2.5 t and be designed for a maximum speed of 30 km / h. When planning the road, it had to be considered that in exceptional cases, the connecting road also has to be free for school bus traffic ... Place of execution: Audigaster Str., Pegau, Saxony Time period: May 2012 - Sep 2013
Infrastructure & Foundation Soil

Road construction measures for the removal of flood damages in the town of Pegau

Due to the extreme flood of the Elster in June 2013, there were massive damages such as demolitions, bursts (potholes) and cracking on several roads (Audigaster Straße, Herrenweg, Probsteisiedlung, Ratszieglei, Unteraue and Auenstraße) in the urban area of Pegau. For this reason, the town of Pegau planned the repair of the roads by means of ground remediation measures. A total of approx. 8,500 m² of road in the urban area of ​​Pegau were remediated. Thereof, about 1,150 m² from scratch, 4,150 m² as ... Place of execution: An der Ratsziegelei, Pegau, Saxony Time period: 2013 - 2015
Infrastructure & Foundation Soil

Remediation of the mixed water drainage from Borna Nord

The remediation of the sewage disposal from Borna Nord between Sauerbruchstraße and Witznitzer Straße was intended to redevelop existing weak points in the sewer system, to create opportunities for a further connection of fortified areas to the sewer system and to provide hydraulic relief for the rainwater retention basins in Borna Nord. The canal construction measure included the replacement of the mixed water drainage coming from Borna Nord over a length of approx. 690 m (DN 300 to DN 800 GFK, approx. 16 shafts) as well as ... Place of execution: Witznitzer Str., Borna, Saxony Time period: Nov 2008 - Dec 2009
Infrastructure & Foundation Soil

Canal and road construction project Neugasse in Pegau

Due to the age-related poor building condition of the road and the sidewalks, the town of Pegau planned a basic construction including the renewal of the road drainage in the Neugasse. The dismantling length of the road was about 145 m in total. In addition to the structural upgrading of the townscape, the road construction project made a significant contribution to the improvement of the road safety and infrastructure of the town of Pegau ... Place of execution: Neugasse, Pegau, Saxony Time period: Sep 2015 - Jan 2017
Infrastructure & Foundation Soil

Sewer remediation of commercial premises and residential buildings in the core area of Munich, Pfeuferstraße

According to the drainage statute of the state capital Munich, the tightness and functionality of the existing land drainage systems has to be proven. In total, the cellar compartments of about 80 flats and 3 commercial units were affected. A renewal of the existing underground pipes did not make sense for economic reasons. Therefore, the connections of the existing downpipes were suspended and supplied via new manifolds in the basement to public sewers ... Place of execution: Pfeuferstraße 12, Munich, Bavaria Time period: Apr 2013 - Feb 2015
Infrastructure & Foundation Soil

Renewal of the sewer system in Stuttgart, Robert-Bosch-Straße

As a result of the calculation in the course of the general drainage planning, it was determined that the mixed water sewer in the Robert-Bosch-Straße in Stuttgart sometimes does not show the required hydraulic performance. Scope of planning - Replacement of approx. 400 m mixed water gravity sewer systems DN 600 StB in open construction, replacement of stonewalled inspection shafts by precast shafts DN 1200 StB, remediation and reconstruction of 2 special shafts ... Place of execution: Robert-Bosch-Straße, Stuttgart, Baden-Wuerttemberg Time period: Jan 2013 - Jun 2014
Environment

AUDI motoring experience area, Neuburg/Donau

The 47 hectare area in the southeast of Neuburg a.d. Donau is a state-of-the-art facility with a variety of offers to get to know the manufacturer's vehicles in different operating conditions and to expand the own driving skills. The site also houses the AUDI Competence Center Motorsport. Long before the first construction measures ... Place of execution: Neuburg an der Donau, Bavaria Time period: Sep 2011 – Nov 2014
Environment

PAH-soil decontamination of a wood impregnation plant for track sleepers and telephone poles, Bergrheinfeld

Implementation planning and tender for the excavation of over 200,000m³ of ground up to a depth of approx. 15m. Excavation partly by means of replacement bores (hot spots), partly by means of ... Place of execution: Bergrheinfeld, Bavaria Time period: 2003 - 2009
Infrastructure & Foundation Soil

Development of the Magdeborner peninsula, Grunaer Bucht

In the past, the entire southern area of Leipzig has been lastingly influenced by numerous lignite opencast mines and their post-mining landscapes, which has recently been transformed into a large-scale water and recreational landscape, the so-called "Leipziger Neuseenland". The community Großpösna plans … Place of execution: Großpösna, Saxony Time period: Dec 2009 – Jul 2011
Water

Creation of a drinking fountain, Feuchter Gemeindewerke GmbH

To ensure the long-term supply of drinking water to the supply area of the Feuchter Gemeindewerke GmbH, a new, 240 m deep well was built in the existing development area next to a disused well. The well opens up in a lower groundwater reservoir the Benker Sandsteine and in the central groundwater reservoir the Schilf-, Blasen- und Unteren Burgsandstein. Both reservoirs are … Place of execution: Feucht, Bavaria Time period: Jun 2010 – Aug 2011
Environment

Landfill „An der Aschauer Straße“, Frasdorf

The landfill, which is stored in a former gravel pit, borders on the stream "Ebnachter Ache" in the north. The stream bed is about 2 m below the landfill bottom. Before the remediation, the area was used as a parking lot and tilled with a de-icing salt warehouse. Because of already … Place of execution: Aschauer Str., Frasdorf, Bavaria Time period: 2008 - 2009
Water

Drinking fountain, Zweckverband zur Wasserversorgung der Moritzberggruppe

For the future qualitative and quantitative assurance of the drinking water supply of the association area, a 216 m deep drinking fountain was created in the Burg- and Blasensandstein with LIas- and Feuerlettenüberdeckung and a sea outlet was laid to the existing treatment plant in the elevated tank. In detail were executed … Place of execution: Leinburg, Bavaria Time period: Oct 2010 – Jun 2012
Environment

Sattler`sche Farbenfabrik, Schonungen near Schweinfurt

In the community of Schonungen was one of Germany's largest arsenic and heavy metal damages in soil and groundwater, caused by the former paints factory Sattler, which was comprehensively explored by several initial and detail exploration campaigns in the years 2000-2005. The studies conducted by the R & H Umwelt GmbH in 2005 ... Place of execution: Schonungen, Bavaria Time period: Jul 2009 – Mar 2016
Environment

Remediation and recultivation of a former domestic waste dump, Sendelbach

The former landfill Sendelbach was used as a domestic waste dump for the city of Lohr a. Main until the end of the 70s and then recultivated in accordance with the state-of-the-art at that time. Based on investigations on risk assessment, the construction of a surface seal was required. As a first step, the R & H Umwelt GmbH ... Place of execution: Lohr am Main, Bavaria Time period: Jul 2013 – May 2015
Energy

Geothermal plant for a technical centre, Leipzig

On behalf of the Leipziger Verkehrsbetriebe GmbH, a technical centre with workshop and office buildings was built in Leipzig-Heiterblick. For the heating of the buildings a large part of the heat generation should stem from renewable energy. For this purpose, drilling work was carried out for a geothermal probe system. R & H Umwelt GmbH was ... Place of execution: Heiterblick, Leipzig, Saxony Time period: Mar – Aug 2012
Infrastructure & Foundation Soil

Wastewater disposal of Raupenhain near Borna

The settlement Raupenhain within the urban area Borna belongs to the association area of the wastewater association "Espenhain". Due to the poor structural condition of the existing mixed water sewer system within the site Raupenhain, the construction of a separating system is planned. In the first phase of construction, ... Place of execution: Raupenhain, Borna, Saxony Time period: Sep 2010 – Nov 2016
Infrastructure & Foundation Soil

Flood protection along the Steppach, Markt Eckental

The district of Brand in Markt Eckental is repeatedly affected by flood events caused by the river Steppach which flows through the village. Isolated local flood protection measures have already been planned and partly implemented, but a coherent protection concept against floods of the Steppach did not exist so far. R & H Umwelt has created a model for the construction of ... Place of execution: Markt Eckental, Bavaria Time period: Sep 2013 – May 2014
Water

Groundwater purification of a hazardous waste landfill, Gallenbach

In the groundwater runoff of the hazardous waste landfill Gallenbach exists a geogenic / anthropogenic caused arsenic and ammonium damage. Based on comprehensive explorations the damage was captured in detail and a concept for the purification of contaminated groundwater was developed. The implementation of the project took place after the initiation and conclusion of a plan approval procedure under public law ... Place of execution: Gallenbach, Aichach, Bavaria Time period: Sep 2006 – Feb 2013
Environment

Dismantling of a nurses‘ home, Klinikum Nürnberg

The 11-storied nurses’ home and the adjoining buildings of the Klinikum Nürnberg Nord, used as kindergarten and commercial building, youth psychiatry and network station, have been empty for a long time. Due to the building condition, the hospital precluded a conversion of the existing buildings and planned to demolish the buildings and to convert the area for the construction of a provisional parking lot ... Place of execution: Prof.-Ernst-Nathan-Straße, Nuremberg, Bavaria Time period: Aug 2013 – Nov 2014
Environment

Demolition and civil engineering works, Alte Kinderklinik Fürth

On the site of the former children's hospital on the grounds of the clinic of Fürth, the district hospitals of Middle Franconia are planning the new construction of a psychiatric clinic. As a preparatory measure, the old children's hospital was dismantled. The buildings to be demolished have a BRI of approx. 40,000 m³. The main building is 7 storeys high. Close to it... Place of execution: Jakob-Henle-Straße 1, Fürth, Bavaria Time period: May 2014 – Jun 2017
Energy

Photovoltaics field facility, Plößberg near Selb

In order to set up a photovoltaics field facility, the city of Selb submitted an application to draw up a development plan with an environmental report. In parallel proceedings, the modification of the land-use plan was changed simultaneously with the setting up of the development plan and the former presentation in the land-use plan was adjusted to the planned determination of another special area. The planning services included … Place of execution: Plößberg, Selb, Bavaria Time period: Jan – Dec 2009
Cookie Consent with Real Cookie Banner