Remediation of the mixed water drainage from Borna Nord

The remediation of the sewage disposal from Borna Nord between Sauerbruchstraße and Witznitzer Straße was intended to redevelop existing weak points in the sewer system, to create opportunities for a further connection of fortified areas to the sewer system and to provide hydraulic relief for the rainwater retention basins in Borna Nord. The canal construction measure included the replacement of the mixed water drainage coming from Borna Nord over a length of approx. 690 m (DN 300 to DN 800 GFK, approx. 16 shafts) as well as ... Place of execution: Witznitzer Str., Borna, Saxony Time period: Nov 2008 - Dec 2009